Cost Plus - Residential
SCHEDULE 3
THE WORK & DOCUMENTS DETAILING THE CONTRACT WORK (a) Description of the Work to be completed by the Builder For example: (i) New house as per details in (b) and (c); (ii) Renovation to 2 storey house as per drawings and details in (b) and (c);
(b) IS ANY aspect of the WORK set out in the contract drawings and specifications excluded from the CONTRACT WORK? n YES n NO (Please tick appropriate box)
If yes , list below the aspects of the work shown in the drawings or described in the specification which will not be carried out by the Builder as part of the works. To avoid confusion list such work below. AMPLE This, for example, would be work which the Owner will do such as painting, landscaping, fencing, and driveways etc. This non Builder work may form part of the works to be done under the terms of approval but not work to be done by the Builder .
10 MASTER BUILDERS ASSOCIATION OF NSW - © Copyright